• By Soumyaroop Mukherjee
  • Mon, 29 Sep 2025 07:00 PM (IST)
  • Source:JND

Mumbai Metro: The Metro Line 4, which is slowly being built and taking shape in the city, is set to become the longest elevated metro route in the city, with a span of 32.4 km running along the Wadala-Ghatkopar-Mulund-Thane-Kasarvadavali route joining the eastern part of the city with Thane.

The Line 4 will also have a 2.66 km extension between Kasarvadavali and Gaimukh. This will take the line into Ghodbunder Road, covering Gaimukh. The Line 4 will have interchanges with other lines at the following points:

  • Line 2B (Ghatkopar)

  • Line 5 (Kapubawdi)

  • Line 6 (Kanjurmarg)

Mumbai Metro Line 4 Full Station List:

  • Kasarvadavali

  • Vijay Garden

  • Dongari Pada

  • Tikuji-Ni-Wadi

  • Manpada

  • Kapurbawdi

  • Majiwada

  • Cadbury Junction

  • Mahapalika Marg

  • RTO Thane

  • Thane Teen Haath Naka

  • Mulund Naka

  • Mulund Fire Station

  • Sonapur

  • Shangrila

  • Bhandup Metro

  • Bhandup Mahapalika

  • Naval Housing

  • Kanjur Marg (Gandhi Nagar)

  • Surya Nagar

  • Vikhroli Metro

  • Godrej Company

  • Shreyes Cinema

  • Lakshmi Nagar

  • Pant Nagar

  • Garodia Nagar

  • Amar Mahal Junction

  • Siddharth Colony

  • Suman Nagar

  • Anik Nagar Bus Depot

  • Wadala TT

  • Bhakti Park Metro

  • Which Lines Are Operational Currently?

    Line

    Route

    Distance

    Metro Line 1 (Elevated)

    Versova to Ghatkopar

    11.4 km

    Metro Line 2A (Elevated)

    Dahisar East to DN Nagar

    18.6 km

    Metro Line 7 (Elevated)

    Dahisar East to Gundavali/Andheri East

    16.5 km

    ALSO READ: Delhi: 3 Killed In Suspected Hit-And-Run At Outer Ring Road In Jahangirpuri

    Which Lines Are Still Under Construction?

    Line

    Route

    Distance

    Metro Line 2B (elevated)

    DN Nagar to Mandale

    23.6 km

    Metro Line 3 (underground)

    Colaba to Bandra to SEEPZ

    33.5 km

    Metro Line 4 

    Wadala to Kasarvadavali

    32.3 km

    Metro Line 4A

    Kasarvadavali to Gaimukh

    2.7 km 

    Metro Line 5 (elevated + underground)

    Thane to Bhiwandi to Kalyan

    24.9 km

    Metro Line 6 (elevated)

    Swami Samarth Nagar to Vikhroli EEH

    15.3 km

    Metro Line 7A (underground)

    Gundavali to CSMIA Airport

    3.5 km 

    Metro Line 9 (elevated)

    Dahisar East to Mira Bhayandar

    11.4 km

    Metro Line 10 (elevated)

    Gaimukh to Shivaji Chowk to Mira Road

    9.2 km

    Metro Line 11 (elevated + underground)

    Wadala to CSMT

    12.7 km

    Metro Line 12 (elevated)

    Kalyan to Taloja

    20.8 km

    ALSO READ: Leh Apex Body Decides To Stay Away From Talks With Centre Until Normalcy Restored In Ladakh

    Mumbai Metro will be completely operational by 2027. However, significant parts of the metro line will be opened for commercial purposes by 2026.