- By Kamakshi Bishnoi
- Sun, 11 Jan 2026 11:58 AM (IST)
- Source:Jagran News Network
In a major step towards modernising Gorakhpur’s water infrastructure, the Jal Nigam (Urban) is set to introduce a 24/7 uninterrupted drinking water supply system. Under this system, water will be supplied round the clock, day and night, seven days a week, ensuring continuous availability for residents.
The pilot project is being launched in Sardar Bhagat Singh Nagar Ward (Mohaddipur), where residents are expected to start receiving the benefits by June. A key feature of the scheme is that drinking water will reach multi-storey buildings without the use of motors, providing significant relief to people living in flats and high-rise buildings.
ALSO READ: Delhi NRI Couple Held Under 18 Day Digital Arrest, Duped Of Rs 14 Cr
Officials said the initiative marks an important move towards a smart and efficient water supply system. Continuous water supply is expected to improve water quality, reduce the risk of contamination in pipelines, and promote responsible water use among consumers.
An estimated Rs 21 crore is being spent on the project, which aims to improve water pressure, quality and overall availability. If the pilot proves successful, the scheme is likely to be expanded to other wards in the city.
At present, water is supplied at fixed hours, forcing residents to depend on storage tanks and electric motors. Under the new system, water will be available 24 hours a day, reducing electricity consumption and eliminating the need for motors. The high-pressure supply system will ensure water reaches buildings up to 21 metres high, equivalent to around six storeys.
As part of the project, around 28 kilometres of new pipelines are being laid, and old, dilapidated pipelines are being replaced to prevent leakage, contamination and water loss. Three new pump houses will be constructed, along with a large overhead water tank behind Orion Mall. The tank will have a capacity of 1,700 kilolitres and a height of 26 metres, enabling a higher-pressure water supply compared to existing tanks, which are about 20 metres high.
Under the pilot phase, 2,616 households will receive new water connections, and water meters will be installed in each home to monitor consumption. However, no charges will be levied at present, despite the installation of meters.
Executive Engineer Sudesh Kumar said the 24-hour water supply scheme will begin in Mohaddipur, with residents set to benefit from the facility by June.
