• Source:JND

Delhi Traffic Advisory: Commuters in central and west Delhi are likely to face traffic congestion over the next few weeks as the Delhi Jal Board (DJB) has begun drainage maintenance and upgradation work on New Rohtak Road, stretching from Kamal T-Point to Zakhira Flyover towards Punjabi Bagh.

According to a traffic advisory issued by the Delhi Traffic Police, the project started on November 9, 2025 and will continue for 45 days, affecting traffic between 11 AM and 9 PM daily. The ongoing work at Anand Parbat will lead to the closure of two lanes on this stretch, causing heavy and slow-moving traffic during working hours.

ALSO READ: CNG Cylinder Safety Guide: How To Maintain CNG Cars; Check the List of Do’s and Don’ts

Officials have advised motorists to plan their journeys in advance and avoid the affected road whenever possible. The advisory also requests commuters to follow on-ground traffic signs and the directions of police personnel deployed at the site.

Delhi Traffic Advisory And Alternative Routes

Commuters travelling towards Punjabi Bagh or West Delhi via New Rohtak Road should take a right turn from Kamal T-Point towards Sarai Rohilla via Veer Banda Bairagi Marg, and then proceed via Inderlok to reach their destination.

Delhi Traffic Restrictions

- Two lanes on New Rohtak Road (Anand Parbat stretch) will remain closed for DJB work.

- Heavy congestion expected between 11 AM and 9 PM

- Delays and slow traffic movement likely during peak hours.

ALSO READ: Delhi Blast Update: Lal Qila Metro Station To Remain Closed On November 12 Amid Security Alert | Details

Advisory For Commuters

- Plan your travel in advance to avoid long delays.

- Follow road signage and the directions of on-duty traffic police.

- Avoid the affected section of New Rohtak Road during work hours and use the suggested alternative routes.

The Delhi Traffic Police will continue to monitor the area to ensure smoother vehicle movement during the maintenance period.

Also In News