• Source:JND

Bengaluru Power Cut: Bangalore Electricity Supply Company Limited (BESCOM) has informed of scheduled power outages in over 50 areas in Bengaluru on Tuesday, December 10. The supply will be disrupted between 10:30 am and 5:30 pm, in view of BESCOM's quarterly and half-yearly maintenance activities aimed at ensuring consistent electricity supply.

READ MORE: Hyderabad Traffic Advisory: Key Routes Closed In View Of IAF Air Show Over Hussain Sagar Lake Today | Check Timings, Diversions

Bengaluru Power Cut: Areas Affected On December 10

The affected areas include key neighbourhoods such as:

-HRBR Layout: 1st, 2nd, and 3rd Blocks, Service Road.

-Kammanahalli: Main Road, CMR Road.

-Babusapalya and Surrounding Areas: Balachandra Layout, M.M. Garden, Arkavathi Layout, Anjanadri Layout Enclave, Divya Unnathy Layout.

-Vijayendra Garden and Nearby Localities: Mallappa Layout, Prakruthi Township, Balaji Layout, G.N.R. Garden, Chelekere, Samurdhrika Enclave.

-Horamavu and Vicinity: 100 Feet Road, Subbayanapalya, Munireddy Layout, Vijaya Bank Colony, Nisarga Colony, Nandanam Colony, P and T Layout, Pappaiah Layout, Coconut Grove Layout.

-Hennur and Surroundings: Ashirwad Colony, Shakthi Nagar, Hennur Village, Byraveshwara Layout, Chikkanna Layout, CMR Layout, Hennur Cross, Kenchappa Garden, Brindavan Layout, Hoysala Nagara, Brindavam Avenue Heritage, Vinayaka Layout, Jayanthi Grama.

-Other Affected Areas: Parts of OMBR Layout, Kasturi Nagar, Pillareddy Nagar, Karavalli Road, Ramaiah Layout, and zones near the BDA Complex.

READ MORE: Karnataka Weather: Showers, Stormy Conditions In State, Bengaluru To See Heavy Rain Till December 10 | Forecast

Bengaluru Power Cut On December 8 

In addition to the scheduled cuts on December 10, BESCOM reported power outages in the Peenya division on December 8 due to emergency work conducted by KPTCL at the 220/66/11 KV SRS Peenya Substation. The outage took place from 10 am to 3:30 pm, impacted several localities in the division.

Residents are advised to plan accordingly to minimise inconvenience during the scheduled maintenance periods. These disruptions are essential for improving the reliability of Bengaluru's power infrastructure.