- By Nidhi Giri
- Mon, 22 Dec 2025 03:42 PM (IST)
- Source:JND
Bengaluru Power Cut: The Bangalore Electricity Distribution Company (BESCOM) has announced a 20-day shutdown in multiple areas in Bengaluru starting December 23, Tuesday. BESCOM has announced the power outage in view of maintenance work of 31.5 MVA Power Converter-3 at the 220/66/11kV EPIP station. BESCOM has urged residents to plan their day in advance to avoid inconvenience during the mentioned period.
The power cut, which will continue till January 11, will take place everyday from 10 am to 4 pm. The Karnataka Power Transmission Corporation Limited (KPTCL) will be carrying out power work in emergency maintenance areas.
Bengaluru Power Cut Areas
As per BESCOM, power cuts will occur in - Konanakunte, Thalaghattapur, Doddakallasandra, Srinidhi Layout, Avalahalli Mantri Apartment, Raghuvanahalli Gubbalal, Kuvempunagar, VV Nagar, VV Layout, Balaji Layout, Royal Farm and Arehalli Manyata Tech Park Sub-Center Fidelity, Philips Incubator, IBM D1, D2, D3 and D4 Blocks, BTS Layout, Hebbal, Kempapura, Vinayaka Layout, Chiranjeevi Layout, Venkatagowda Layout, Madhuvana M2 Block, Rachenahalli, Sriramapura, Chamundeshwari Layout areas.
ALSO READ: Private Offices Not Adhering To GRAP-4 Norms To Face Action: Delhi Minister Warns Amid Very Poor AQI
L&T, RMZ Next, Ragihalli-Siddapur Gate, EPIP Layout, TCS Software, SJR Tech Park (EPIP Layout), M/S VSNL Feeder, Reliance (Big Bazaar), Oriental Hotel, Airtel, Bushra Tech Park (EPIP Layout), Gopalan Enterprises, Sada Tech Park (EPIP Layout), Qualcomm, Qualcomm-2, GE BE Company, Bagmane Neon Block, EPIP Industrial Area and surrounding areas.
Royal Enclave, Thanisandra, B Narayanapura Cross, BDS Layout, Chikkalasandra, TG Layout, Bhubaneswari Nagar, ISRO Mantri Lithos, Coffee Board Layout, Fatima Layout, Kumaraswamy Layout, Vitthalnagar, Layout, Umiya Velocity and surrounding areas, Vikram Nagar, Kadirenahalli, Abbayyanaidu Studio, Naidu Layout and surrounding areas.
